A building management system (BMS) depends on its controllers, sensors and meters being able to talk to each other. They do that over data networks, and a single building often has more than one type. This guide is a plain introduction to the common ones and to what matters when they are installed.
It is a general overview. On a real project the controls specialist's design and the manufacturer's instructions always come first.
Why a building has several networks
Different equipment speaks different languages. A chiller may report over one protocol, the heat meters over another and the lighting controls over a third. The BMS brings them all together on one screen, but each network still needs the right cable, installed in the right way.
BACnet and Modbus
These are the two names most people meet first. Both are open standards, used by many manufacturers to connect controllers to plant such as chillers, boilers and air handling units. In their most common wired form the cable runs from one device to the next in a single chain, so the order and the route both matter.
M-Bus
M-Bus, short for Meter-Bus, is used to read heat, water and energy meters. It is common in residential and mixed-use buildings, where every apartment or tenant is metered separately.
KNX and LON
KNX is widely used for lighting and room controls. LON is found on many existing systems. Each uses its own type of cable and has its own rules for how that cable may be laid out.
Cat6 and fibre
Newer controllers, touch-screens and sensors connect over standard computer networking, on Cat6 cable or fibre. Each cable runs back to a network switch, and each one can be tested and certified once it is in.
What matters during installation
- The cable that was specified for each network, not a substitute.
- The layout the network expects, whether a single chain or separate runs.
- Data cables kept apart from power cables.
- Clear labels at both ends of every cable.
- Testing before the ceilings are closed.
A network fault rarely shows until the system is switched on. By then it can be slow and awkward to trace, which is why careful installation and testing save time at the end of a project.
Who does what
The controls specialist chooses the networks and designs them. The electrical contractor installs the cable to that design, tests it and records the results, then stays on to support commissioning. When the two work closely, problems are found while they are still easy to fix.
Questions worth asking an installer
- Which of these networks have you installed before?
- How are the cables labelled and recorded?
- What test results will be handed over?
- Will the same team be on site during commissioning?
Where we fit in
R Z Electrical & Controls installs network, controls and power wiring for controls specialists across London and the South East, as part of the BMS electrical package. Our projects page shows the kind of buildings involved.